Second week of house renovation

Things are a bit chaotic at the moment. Luckily, it will be over in a week or two, maybe three. Plans seldom survive first contact in battle, or, in this case, realization by workers. Renovation is often underplanned and under budget, otherwise it wouldn’t get a “go ahead” by the house owner, who rather avoids spending money on old housing stock, rather spending it on new housing, much more profitable I assume.

Needs a final coating

Saturday I finished the upstairs by painting two doors that should’ve received their second coat of paint lacquer more than a year ago. I had put it off for too long. Now the upstairs is finally done!

Infrared panel

Monday morning, there was an unexpected ring on the door bell. It was a firm trying to install aeration for the downstairs part of the house, plus heating for the annex/outside bathroom (in winter, when it freezes, it got cold there, like 12℃ (-8℉), which was why I installed a small IR panel myself. Obviously, that is no longer needed, and I can repurpose it elsewhere in my house, using electricity from my—to be installed—solar panels.

Control panel of IR panel

It was a hassle, with an electrical short that had to be solved. It was, and I got a RF controlled panel to control my infrared panel in the winter. It will be so much more cosy, and no longer do I need to make excuses when visitors want to use the bathroom, that it’s so very cold in there.

Ceiling removed

Anyway, the ceiling will stay removed until the new aeration system is installed. Until then I will keep using the old one, very noisy and energy-inefficient. It would’ve been installed today, but it couldn’t; there’s scaffolding for the roof worker in the way. When that’s removed, the firm will return to finish the aeration system.

Control panel for mechanical aeration

Its control panel and CO2 sensor is already installed, communicating over indoor mains. The thing to communicate with has to wait a little longer.

Front roof

Back roof

The progress on the roof is slow, because eight houses are done all together with a single crew of roof worker (other crews are working on other blocks of houses). Still, judging from what I’ve seen already, I expect them to be finished by the end of next week, at the latest.

Then there’s the solar panels and mechanical aeration system to be installed, and the renovation is over. By that time I hope to be done with indoor home improvement as well.

🏠